-Demolition and design to facilitate extension from old existing floor area of 65m2 to 210m2.
– Removal of a dividing load bearing wall.
– Construction of 1st floor office fit out.
– Fit Out of new shop design.
We hope you are all keeping safe and well in these difficult and strange times.
While all our contract works are currently on hold we continue to provide support to our clients in the delivery of essential works in line with those detailed by the Government and the HSA. If you see our vehicles on the road but please be assured that this is only for essential or emergency works for our clients.